HomeServicesQuayside Operations

Quayside Operations

Upon arrival at the facility, two of the available options of off-loading the barge are:

  1. All equipment will have the sea fastenings removed and be off-loaded using the jack and trailer method, or the skid beam method.
  2. Modules/decks can be cut up aboard the barge and the re-usable equipment lifted out and place on the quayside.
Go to top